Hello All! I hope your fourth was fabulous. I know mine was. Remember, I've picked up a new project, the stinky one, besides helping to finish up step one in the previous synthesis (You know the yellow one). Well this week at one point Monday or Tuesday I had four separate projects that I needed to run. Only two got done that day. It was crazy. I needed to filter, neutralize, rotovap, and more to three different solutions/mixtures. I finished all the things I need to do with the yellow stuff, minus characterization, but the stinky stuff is another story. I still need to do a vacuum distillation tomorrow. We'll see how it all ends up. Hopefully well!
I did get to enjoy two fireworks shows. The Elver Park fireworks were pretty impressive, see video above for an idea of the grand finale. I also went to Noah's Ark Water Park and went almost vertically down ten stories on my back! I was pretty proud of myself for getting out of my comfort zone so much. And a friend came to visit for the day on Saturday. That was wonderful. Church was good this morning.
 |
When working with stinky stuff ones gloves must air out in the back of the hood |
 |
Liquid nitrogen to help with the filtration process |
 |
After being in the liquid nitrogen bath |
 |
Happy 4th! |
 |
Mixture |
 |
Dinner after Noah's Ark |
 |
The Filtrate |
 |
Mixture being filtered |
 |
Again after Noah's Ark |
 |
I've been craving one of these |
 |
Vacuum distillation setup |
 |
All the pH test strips I used (Pink is acidic, orange is pH 5) |
 |
All of the base I added...611 mL and only to a pH of 5! |
 |
My feet...I walk a lot here |
 |
My roomie and me |
 |
Our feet |
 |
Before rhythm and booms, Happy Birthday, Xiaoyin! |
 |
To read from dad. |
 |
My homework |
Comments
Post a Comment